Start With the Panels That Protect It All #

This phase of your building project adds protection and durability. Done correctly, panel and insulation installation locks in energy efficiency and weather resistance. This section covers everything from pre-drilling screw holes to installing corner and eave trim with proper sequencing.


Understand Your Panel Types #

SNAP buildings use two panel profiles (see Figure 18):

  • R Panel: Symmetrical, can be installed in either direction
  • PBR Panel: Same profile with an extended purlin-bearing leg for better overlap

Always start panels with laps going with the wind to prevent uplift.


Prep the Worksite #

  • Stage panels in stacks of 10 for easy pre-drilling
  • Secure all materials from wind before installation
  • Place insulation near install zones to reduce handling

Diagram: Panel Stack for Drilling #

Fig. 21 – Stack in 10s and clamp securely before drilling lap and pilot holes.

Pre-Drill Sidewall Panels #

Drill pilot holes for clean screw placement and professional appearance:

Lap Screws #

  • 1/4″ clearance holes
  • Every 30″ along the high rib
  • First hole 1-7/8″ from bottom, last 1″ from top

Base-Angle Pilot Holes #

  • 1/8″ holes in panel flats beside ribs
  • Every 6″ along bottom edge

Girt Pilot Holes #

  • 1/8″ holes in flats, approx. 12″ apart

Based on girt spacing from drawings


Install Sidewall Insulation #

  1. Cut insulation 4–6″ longer than panel height
  2. Use double-sided tape on base-angle and eave strut
  3. Stick insulation in place, trim flush to structure
  4. Leave 2–4″ of vapor barrier past the insulation for sealing

Never allow insulation to wick moisture from the concrete slab.

Install Wall Panels (Starting Panel) #

  1. Start at a corner
  2. Raise panel 1/4″ off the slab
  3. Align high rib with framing edge
  4. Secure using #12 x 1-1/4” self-tapping screws in pre-drilled holes

Diagram: Wall Panel Start Example #


Stitching & Sealing Panels #

  • Lap screws: #12 x 7/8” self-tapping with sealing washer
  • Install every 30″ along panel overlaps
  • Do not overdrive screwsβ€”seal washer must compress, not split
  • Avoid walking on panels until fully secured

Install Trim and Flashing #

Corner Trim #

  • Place 1″ below eave trim
  • Fasten every 30″ with #12 screws

Eave Trim (No Gutter) #

  • Seat trim at eave, align with wall panel ribs
  • Screw into high rib every 3′

Gutter Counter Flashing (With Gutter) #

  • Screw flashing to eave strut (not panels)
  • Use approved caulk at all lap joints
  • Align screws under roof high ribs to avoid visible heads

 Diagram: Eave Trim and Corner Trim #

Fig. 46 – Align trim flush at top, keep 1/4″ off foundation, fasten through ribs.


FAQ #

Can I install panels without pre-drilling?
You can, but pre-drilling ensures straight lines and a clean finish. It’s highly recommended.

What insulation types work best with these panels?
Reinforced vinyl-backed roll insulation is the standard. Foil-backed is also compatible.

How high off the slab should I install panels?
Minimum 1/4″. Direct contact voids the panel warranty due to wicking/corrosion.


πŸ“˜ Bonus: Panel Screw Spacing & Trim Guide #