The Top 5 Construction Delays (and How SNAP Helps You Avoid Them)

By Justin Grimes, Co-Founder of SNAP Buildings
Justin has managed hundreds of metal building projects throughout Texas and the U.S., and has built SNAP’s process specifically to eliminate common timeline killers like permitting gaps, material delays, and subcontractor failures.

Construction delays are one of the biggest pain points in any project.

Whether you’re building a 3,000 SF warehouse or a 10,000 SF commercial facility, even one misstep can snowball into weeks of lost time—and budget.

Here are the top 5 causes of construction delays in Texas—and how SNAP Buildings actively prevents them.

1. 🛑 Permit Delays

Most delays happen before construction even begins.

The problem? Drawings that don’t meet local codes, incomplete applications, or poor follow-through.

✅ How SNAP Prevents It:

  • We manage all permitting in-house
  • Submit early, follow up consistently
  • Use PE-stamped drawings tailored to your county’s wind load and building codes
  • Coordinate with city/county offices directly

➡️ Read More: Permitting in Texas – What You Need to Know

2. 📦 Material Backorders or Freight Delays

Steel lead times can stretch from 4 to 12+ weeks, especially if materials aren’t ordered at the right phase.

Contractors that delay ordering often leave crews standing around—no building, no progress.

✅ How SNAP Prevents It:

  • We lock in your building order early
  • Schedule steel delivery based on slab completion
  • Use national suppliers with dependable lead times
  • Reduce risk of “surprise shortages”

“SNAP had the steel on-site the week after our slab cured. The crew never paused.” — Victor T., Walker County

3. 👷 Subcontractor No-Shows

One flaky trade can blow your whole build schedule.

We’ve seen clients burned by crews that ghost, delay, or overbook—causing a domino effect of downtime.

✅ How SNAP Prevents It:

  • We use established subs we’ve worked with for years
  • Build buffers into the calendar
  • Assign a dedicated project manager to coordinate trades directly
  • No reliance on “whoever’s available”

4. 🧱 Slab or Site Problems

Here’s a big one. Bad weather, poor prep, or uninspected pours can cause:

  • Failed slab inspections
  • Foundation rework
  • Delays before steel ever arrives

✅ How SNAP Prevents It:

  • We handle pad prep and slab in-house
  • Pour to engineered spec
  • Schedule inspections in advance
  • Work with city/county inspectors directly

“Our last builder failed slab inspection twice. SNAP got it right the first time.” — Mark E., Property Owner, Texas Gulf Coast

5. 🔄 Change Orders from Poor Planning

Unplanned changes mid-project—like moving doors or switching finishes—can halt everything while materials are reordered.

✅ How SNAP Prevents It:

  • We finalize layout, finishes, and framing before the build
  • Provide CAD layouts and scope approvals upfront
  • Catch issues in planning—not in the field

➡️ Download the Free E-Book: From Dirt to Done

Final Thoughts

Every construction project carries some risk. But with the right process and the right team, most delays are 100% preventable.

At SNAP Buildings, we’ve built our entire process around avoiding these 5 issues—so you get a building that’s done right, done once, and done on time.

➡️ Request a Build Quote That Stays on Schedule
➡️ Get Our Free E-Book: From Dirt to Done

Why Trust SNAP Buildings?

  • Licensed PE and GC across all 50 states
  • 300+ commercial buildings completed on time and on budget
  • In-house team for permitting, slab, steel, and finish-out
  • Trusted network of subs and inspectors
  • Transparent timelines and progress tracking from Day One

“Our last project dragged for 6 months. SNAP delivered this one in 9 weeks start-to-finish.” — Jennifer M., Developer, Texas Hill Country